Saturday, October 23, 2010

Roof is stripped



The first layer of wood that will become the ceiling in the Hay Loft.

Within 3 days we have the roof completely stripped. It is determined that we want to keep the old oak rafters for their looks but they really need to be supplemented with new ones to support the weight of the new tile. Off we go in the work van to the Toute Faire. Another 1000 euro and we have rafters. These rafters are put in place with nails that are bigger than any sold in the US. We need a bigger hammer. The old tiles were set on slats with broken pieces of tile under each one to shim them into place. The new tiles require a flat surface so that they can interlock. It will be necessary to level these beams both from side to side and front to back. A time consuming process. After the rafters are put in place the batons are placed across them and spaced so that the tiles precisely overlap. These batons must also be very straight or the roof will look like ocean waves. Jules and Eric find their rhythm and Patric becomes the narrator (Vs the worker). This “team” Patric and Erin we find out later do less work when they are together than when alone. It seems that their process is for Patric to pick up the tile and hand it to Eric to place when Eric could pick up the tile himself. They like the CafĂ© the lunches the cigarettes and oh yes the euro so they work together at twice the cost to me. It is not long that we let Patric go back to catching and killing chickens.

No comments:

Post a Comment