Saturday, October 23, 2010

We arrive early in the morning.


The Manitou is supposed to arrive this morning or maybe the next. JP One of our French cousin has arranged for the delivery and a “special price”. JP’s help has been fabulous. One thing for sure is that the old roof must be stripped off so that is where we will start. The back side of the house is only 1.5 stories high and more accessible than the front full two story approach. The back side is also at a lower angle. Jules does not want to “walk” the front side of the roof and prefers to “work out of the bucket”.

Georgette invited Barry to use any and all of Jean’s (her deceased husband – another cousin) tools so the first stop is at Mommoulouse to shop around in his garage. Barry had been in there before and was impressed with the tools and equipment tucked into various cabinets and a large loft. There were also 10-15 jacks made for tunneling in a rack at the back of the garage. These would come in handy for the “pootra” (major support beam) part of the project. Jules approaches the garage with a take no prisoners profile. He is like a kid in a candy store. Soon the rental car is full to the top with rakes shovels jacks all sorts of hammers and electrical tools from grinders to cut off saws. This is where I begin to think that the Hertz rental car just became a utility truck. The only thing missing was the roof rack. Off to Montegut we go. The rental Fiats is riding down on its bottom and struggling to move at all.

No comments:

Post a Comment