Saturday, October 23, 2010


With the help of cousin JP we are told to go to another village to the Toute Farie (not to be confused with the Tooth Fairy). He knows the manager there and has an account. Jean-Michel also speaks a little English. Barry and Jules find the blocks, of course they are larger than the ones used for the last post project (we think the old blocks are circa 1940) We buy a stack of blocks, all that will fit in the back of the Hertz rental car, put a few bags of concrete in the back seat and off we go back to Montegut. This is the first day and I am already lost in the drama. So glad I brought my Kindle. After all the materials are unloaded I park the car in the shade and get back to my book. Every kind of construction noise comes from the barn. Wood cutting, concrete drilling, block cutting, hammering, by the end of the day there is a stack of blocks that reach the floor above. Barry and Jules agree that day one was a good one. They are both filthy beyond belief, covered with sweat and pouter from the terracotta block cutting and saw dust from the post cutting. Jules is covered with concrete from head to toe. There is about 2 feet of straw on the second floor of the barn with about 2 inches of dirt under the straw and on top of the board floor. It takes Barry and Jules about an hour to dig a path through this stuff to make sure they do not step in any hidden. Both must wear masks because of the dust. After all this... Yes, they plop themselves down in the Hertz rental and we head back to Monteseque and Bassouse. This will be our daily grind for 3 weeks. It is clear to me that I am not needed on a daily basis. I will run errands from time to time but full time contact with the project is not necessary.

No comments:

Post a Comment